Capability

Five-Axis Impeller Machining

Drawing-driven manufacturing coordination for complex impellers used in pumps, compressors and turbomachinery.

Evidence status

Approved hero evidence is required before production release

No factory or component image is shown until a real, rights-cleared asset is approved.

Buyer inputs

What to include for review

  • Drawing revision
  • Material or grade
  • Quantity
  • Required timing
  • Inspection requirements

How we work

From drawing review to delivery

  1. Drawing Review

    Drawing revision, material, quantity, timing and inspection requirements are reviewed.

  2. Quotation

    The proposed production route and inspection scope are defined for the project.

  3. Production

    Manufacturing is coordinated through long-term partners against the agreed scope.

  4. Verification

    Inspection follows the project-defined requirements and documentation scope.

  5. Delivery

    One Geetai contact coordinates the project through delivery.

Materials

Material scope starts with the drawing

Other customer-specified materials are subject to drawing and manufacturability review.

  • Aluminum alloys
  • Stainless steels
  • Titanium alloys
  • Nickel-based superalloys
  • Copper alloys
  • Engineering plastics

Quality review

Requirements are agreed for the project

Inspection scope and documentation are defined during quotation according to drawing requirements and application needs.

Machining envelope and tolerance capability are confirmed after drawing review.

Evidence status

Capability confirmed after drawing review

Geetai coordinates production through long-term manufacturing partners; partner facilities and equipment are not presented as Geetai-owned.

Drawing-led review

Send the drawing for review

Include material, quantity, timing and quality requirements.

Upload Drawing