Technical insight
Impeller Pilot Runout: Separate Part and Assembly Checks
Ask for two distinct records when the order covers both part inspection and mounted assembly acceptance. Identify the controlled pilot surface and datum axis on the drawing, then define which physical assembly the second check covers.

By Geetai Precision
- Published
- Updated
Identify the pilot surface and reference axis
A pilot can be an outside register or a bore, depending on the part drawing. Mark the controlled cylindrical surface and the datum features used to establish the axis. If the same drawing also controls the seating face, keep that check separate in the report.
Hexagon describes circular radial runout evaluation at individual sections of a cylindrical feature and total radial runout evaluation across the measured surface using a common datum axis.
ASME lists Y14.5 as the standard for stating and interpreting geometric dimensioning and tolerancing requirements. For acceptance, confirm the standard and edition invoked by the released drawing.
Evidence to request before first article approval
| Decision | What to record | Release question |
|---|---|---|
| Bare impeller | Part identity, drawing revision, pilot surface, datum features and how the axis was established | Does the report evaluate the same feature and datum reference as the drawing? |
| Circular radial runout | Individual measurement sections, readings and the section used for disposition | Did the plan cover each section required by the drawing or agreed inspection plan? |
| Total radial runout | Surface coverage, agreed evaluation method and the reported result for the covered surface | Does the method cover the specified axial extent? |
| Mounted assembly | Impeller and mating part identities, assembly condition, measurement surface and reference axis | Does the record cover the assembly named in the purchase order? |
| Conflicting readings | Both records and any setup changes, including seating, cleanliness and clamping | Who can decide whether the evidence points to the part, setup or assembly? |
Plan the machining and inspection handoff
Before finishing, identify how the pilot and its locating surfaces are referenced in each machining setup. If the part changes setups, ask for the plan to re-establish the drawing reference. Schedule the bare-part inspection after any specified finishing operation that could change the accepted surface.
If the order includes a mounted check, name the mating hardware and the approved assembly procedure in advance. Record the controlled assembly condition with the reading. When the mounted reading differs from the bare-part report, keep both records. Check seating and setup according to the approved procedure, then send the discrepancy to the assigned decision owner before any rework.
For a quote, share the drawing and revision, the intended inspection sections, and any separate assembly instruction. Ask for a sample report format showing the measured surface, datum setup and identity of the inspected hardware.
Scope of the acceptance decision
Inspection scope and documentation are defined during quotation according to drawing requirements and application needs.
Frequently asked questions
Can a reading at one section cover total radial runout?
Ask for the drawing-defined surface coverage and evaluation method. Use a one-section result only for the check that the approved inspection plan assigns to that section.
What if the bare impeller passes and the mounted assembly reading is outside its limit?
Keep the bare-part and mounted readings linked to their separate requirements. Check the specified assembly setup and have the assigned authority determine which acceptance requirement remains open.
Related review paths
More from Blog
References
- PC-DMIS — Creating a Runout Feature Control Frame Dimension — Hexagon. Accessed 2026-11-13T15:34:07.096Z.
- ASME Y14 Standards — Y14.5 Dimensioning and Tolerancing — ASME. Accessed 2026-11-13T15:34:07.096Z.
