Technical insight

Rotor Balance Reports: How to Check Residual Unbalance in Each Plane

Ask the balance provider to identify the planes used for acceptance, the limit assigned to each, and the final measured residual in the same plane basis. If the printout only shows correction-plane readings, ask how they map to the specified limits before signing off.

Curved-blade impeller with a central hub and broad outer rim
Owner-supplied impeller photograph for geometry context. Confirm the axial plane locations from the drawing and balance plan.

Identify the basis of the two readings

ISO 21940-11 distinguishes the planes used to apply mass corrections from the reference planes used to judge residual unbalance. In the two-plane case, the total permissible residual unbalance is allocated to those reference planes.

Start with the sketch or axial locations in the approved plan. Ask the provider to label each reported plane using the same orientation and reference feature as that plan. A left/right label without a viewing direction leaves room for swapping two readings. Record the limit and the measured residual with units on the same basis for each plane.

Review the readings after the last correction

Schenck describes a typical manual balancing sequence in which the system calculates a correction for each correction plane and the operator follows the correction with a verification run. The correction instruction and the remaining unbalance serve different purposes.

Review the final verification run for the agreed configuration. If machining, coating, or assembly follows that run, have engineering decide whether the delivered condition needs a new check. For a first article, have the supplier submit one worked report for review before settling the production report format.

What the report showsWhat to ask forDisposition
Two final readings at the approved reference planesThe limit and units beside each reading and a sketch identifying the planesCompare each final magnitude with its own approved limit.
Left and right correction locations onlyPlane definition, viewing direction and approved mapping to the acceptance basisHold release until the readings and limits can be compared in the same planes.
One overall limit with two reported readingsApproved allocation and the configuration to which it appliesRefer the allocation to the responsible engineer before making a pass decision.
Mass-to-remove values or correction anglesFinal verification results for both required planesUse the final residuals to determine acceptance.
A revised condition after the recorded runWho approved the change and what check applies to the delivery configurationAgree whether a repeat balance verification is needed before release.

Settle ambiguous results before shipment

For an asymmetric example, suppose one plane comes in below its limit while the other exceeds its own limit. Record the second result for disposition. A favorable reading on the first plane does not authorize a transfer of allowance. If a different allocation is proposed, request written design approval and a report on the newly approved basis.

Inspection scope and documentation are defined during quotation according to drawing requirements and application needs.

Frequently asked questions

Can the supplier split the overall allowance equally between the planes?

Use the allocation agreed for the actual geometry and acceptance basis. Where the order states only one overall number, have engineering specify what is to be assigned to each plane.

Do matching units mean a correction reading can be compared with a reference-plane limit?

Confirm that both quantities refer to the same plane basis. Where they differ, ask for the approved conversion or for a final report in the specified planes.

Related review paths

More from Blog

References

  1. ISO 21940-11:2016 preview, sections 4.4–4.6 — Slovenian Institute for Standardization (SIST). Accessed 2026-11-16T01:48:27.740Z.
  2. Balancing Machines for Rotors & Components: measurement and verification — Schenck RoTec. Accessed 2026-11-16T01:48:27.740Z.

Drawing-led review

Move from general guidance to drawing review

Share the controlled drawing, material, quantity and verification requirements for project-specific review.

Discuss Your Drawing